Objective:
·
To configure the project
development
·
To get the costing of the
project
·
To make the plan and time to
finish the
·
Do the project planning
using Microsoft project (Gantt Chart)
Procedure:
1. Produce
the table that listing all the activities to be done for the project
2. List
all the component to purchased
·
Resistor 180 ohm, resistor
15M 0hm, resistor 100k ohm
·
Variable resistor 1M ohm
·
Capacitor 1 farad, capacitor
470 micro farad,
·
Transistor TIPP31C npn,
zener diode 1 watt, signal diode 1N4148, Transistor 2N3819
·
Solar panel 6v-12v 1mW
·
P.C.B board
3. Make
a survey the market price of the component
4. List
the component and make costing
5. Estimate
the duration of each task of the project
6. Key
in all the information from the table to ‘Microsoft Project’.
7. Save
the project planning and print out the ‘Gantt chart’
Result
and analysis:
·
Project planning is done
with Gantt chart
·
Project planning is
important to estimate the time and cost to produce the project and details how
the project will be conducted stage by stage.
·
Internet survey is needed to
make sure the market price.
Conclusion:
The conclusion from the project planning by using the
‘Microsoft Project”, we are able to do the estimating for due time of the
project and the cost to start the solar project construct. This is important to
us to manage the project regularly.